Blueeyedwoman Wrote:Randy Zimmerman.
Shenanigans Wrote:nope
BIRD33 Wrote:Ive dealt with almost everyone involved on that project even though that job went down right when I started. I love the thought of the water coolers not being grounded and having kids shoot water into their mouth while touching the metal.Wouldnt the contractor know what he was doing (fire stopping) wasnt up to code?Was the material spec'd and the contractor just ignored it?
Shenanigans Wrote:That was just the last find there. The block walls started buckling/crumbling while it was still under construction. If you're familiar with the project you'll know they didn't fill the block cells completely and left rebar just floating in a lot of the block.
BIRD33 Wrote:What a mess.This is the first I heard of this job.Was it all spec'd out correctly and the contractor did a half ass job?
Shenanigans Wrote:yeah they just cut corners. didn't vibrate the concrete, etc. it was horrible. and cost as much as the original project just to fix it.
BIRD33 Wrote:Gotta love suppling material to the same job twice. There is so much school work going on this summer in PA it's ridiculous.
Shenanigans Wrote:I did school work for the last company I was with. I'm thankfull to be rid of it. too much damn paperwork and late night meetings.
BIRD33 Wrote:Oh I hear ya.Some bitch who doesnt know shit about construction thats on the school board gets to make decisions without understanding anything.For what I do they are cash cows.Lots of high $ shit spec'd.
Shenanigans Wrote:dead on.
I've moved on to collage work.
BIRD33 Wrote:I find cutting the pictures out a bore.