The Report Card for America's Infrastructure, prepared by the American Society of Civil Engineers, gives the US Electric Grid a rating of D. Its summary says the following:
The U.S. power transmission system is in urgent need of modernization. Growth in electricity demand and investment in new power plants has not been matched by investment in new transmission facilities. Maintenance expenditures have decreased 1% per year since 1992. Existing transmission facilities were not designed for the current level of demand, resulting in an increased number of "bottlenecks," which increase costs to consumers and elevate the risk of blackouts.
An article from EnergyBiz by Edwin D. Hill, president of the International Brotherhood of Electrical Workers, says:
The average age of power transformers in service is 40 years, which also happens to be the average lifespan of this equipment. Combine the crying need for maintenance with a shrinking workforce, and we may find that the 2005 blackout that affected parts of Canada and the northeastern United States might have been a dress rehearsal for what's to come. Deregulation and restructuring of the industry created downward pressure on recruitment, training and maintenance, and the bill is now coming due.
Federal Energy Regulatory Commission (FERC) chairman Joseph Kelliher is quoted as saying:
The U.S. transmission system has suffered from underinvestment for a sustained period. In 2005, the expansion of the interstate transmission grid in terms of circuit miles was only 0.5 percent. At the same time, congestion has been rising steadily since 1998.
Transmission underinvestment is a national problem. We need a national solution. Pricing reform is an important part of the solution to this problem.
The U.S. power transmission system is in urgent need of modernization. Growth in electricity demand and investment in new power plants has not been matched by investment in new transmission facilities. Maintenance expenditures have decreased 1% per year since 1992. Existing transmission facilities were not designed for the current level of demand, resulting in an increased number of "bottlenecks," which increase costs to consumers and elevate the risk of blackouts.
An article from EnergyBiz by Edwin D. Hill, president of the International Brotherhood of Electrical Workers, says:
The average age of power transformers in service is 40 years, which also happens to be the average lifespan of this equipment. Combine the crying need for maintenance with a shrinking workforce, and we may find that the 2005 blackout that affected parts of Canada and the northeastern United States might have been a dress rehearsal for what's to come. Deregulation and restructuring of the industry created downward pressure on recruitment, training and maintenance, and the bill is now coming due.
Federal Energy Regulatory Commission (FERC) chairman Joseph Kelliher is quoted as saying:
The U.S. transmission system has suffered from underinvestment for a sustained period. In 2005, the expansion of the interstate transmission grid in terms of circuit miles was only 0.5 percent. At the same time, congestion has been rising steadily since 1998.
Transmission underinvestment is a national problem. We need a national solution. Pricing reform is an important part of the solution to this problem.