approximately how much concrete will i need to pour a 20' x 25' x 6" slab of driveway? also, what's the best method for tearing out an existing driveway without access to a jack hammer? TIA


Hey Asshat - Banana - 07-19-2005

Asshat, can you come do my driveway?


Hey Asshat - VitaminE - 07-19-2005

You could always use rubber cement.


Hey Asshat - Jdub - 07-19-2005

cLaY Wrote:approximately how much concrete will i need to pour a 20' x 25' x 6" slab of driveway? also, what's the best method for tearing out an existing driveway without access to a jack hammer? TIA
Eye Candy


Hey Asshat - asshat - 07-19-2005

cLaY Wrote:approximately how much concrete will i need to pour a 20' x 25' x 6" slab of driveway? also, what's the best method for tearing out an existing driveway without access to a jack hammer? TIA
10 cubic yards of concrete (20 x 25 / 9 x 6 / 36 = 10 cy)

If you don't have access to a jack hammer, then you will either need a small backhoe or a big sledge hammer. You could saw it up (or pay someone to do it $100 minimum probably) into small squares for easy removal.


Hey Asshat - snarg - 07-19-2005

convert the feet and inches to yards
do the appropriate volume calcs

assuming there is no footer around the edges
you might consider having it less thick in the middle, it is a lot of concete
they sell it by the yard

do you have access to some illegal immigrants??
they love to break up concrete


edit:
ooooops
didnt see you around mr asshat
sorry to intrude


Hey Asshat - cLaY - 07-19-2005

10 cubic yards...approx. 80 cube yard i'm guessin?

existing drive is only 10X25 now, so should be simple enough to hammer the fuck outta it and rip it up myself....I think.


Hey Asshat - Bill - 07-19-2005

cLaY Wrote:10 cubic yards...approx. 80 cube yard i'm guessin?

existing drive is only 10X25 now, so should be simple enough to hammer the fuck outta it and rip it up myself....I think.

dood, your a skinny little dood....your gonna hurt yourself.


Hey Asshat - VitaminE - 07-19-2005

cLaY Wrote:10 cubic yards...approx. 80 cube yard i'm guessin?

existing drive is only 10X25 now, so should be simple enough to hammer the fuck outta it and rip it up myself....I think.

Have one of your buddies hide a bag of weed under the slab. I'm confident you'll get that concrete cleaned up un no time.


Hey Asshat - cLaY - 07-19-2005

Bill Wrote:dood, your a skinny little dood....your gonna hurt yourself.

I'm fuckin' scrappy, I can handle it. If not, my buddy works for a concrete place, I'll have some illigals come do it for a Corona an hour.


Hey Asshat - snarg - 07-19-2005

VitaminE Wrote:Have one of your buddies hide a bag of weed under the slab. I'm confident you'll get that concrete cleaned up un no time.



:loool:


Hey Asshat - asshat - 07-19-2005

cLaY Wrote:10 cubic yards...approx. 80 cube yard i'm guessin?

I have no idea what that means.

When you call to order the concrete, they should be able to deliver one 10 cubic yard load. Some cities will only allow 8 cubic yard trucks. If so, then order the 8 cubic yards and then back order the last 2 yards or whatever you think you are short. Sometimes you lose more concrete than you think (that or they fuck you on how much is on the truck). You will probably end up using a half yard or so over 10 cubic yards. You can order the tag load off of the truck that makes the first delivery.


Hey Asshat - cLaY - 07-19-2005

asshat Wrote:I have no idea what that means.

When you call to order the concrete, they should be able to deliver one 10 cubic yard load. Some cities will only allow 8 cubic yard trucks. If so, then order the 8 cubic yards and then back order the last 2 yards or whatever you think you are short. Sometimes you lose more concrete than you think (that or they fuck you on how much is on the truck). You will probably end up using a half yard or so over 10 cubic yards. You can order the tag load off of the truck that makes the first delivery.

Ahhh okay, i get ya now.


Hey Asshat - snarg - 07-19-2005

does he really need a 6" slab, mr hat??


Hey Asshat - SanDog - 07-19-2005

cLaY Wrote:10 cubic yards...approx. 80 cube yard i'm guessin?

existing drive is only 10X25 now, so should be simple enough to hammer the fuck outta it and rip it up myself....I think.

You can rent a small jack hammer for $50 or so from Home Depot or any equipment rental yard.
Also, make sure if you are doing this yourself you get your forms right. You do not want to end up with a wavy drive way.


Hey Asshat - cLaY - 07-19-2005

snarg Wrote:does he really need a 6" slab, mr hat??

i'm guessing yes, its pretty sandy here in KS...but i'm no expert.


Hey Asshat - snarg - 07-19-2005

i was addressing dr asshat
thanks


Hey Asshat - asshat - 07-19-2005

snarg Wrote:does he really need a 6" slab, mr hat??
New home builders around here generally put down a 2 inch sand cushion and then 4 inch concrete.

When I do city jobs, most cities require 5 inch concrete for driveways. If it was me, I would go with 6 inches since he is only ordering one load anyway.

Clay, use 2 x 6's for your forms. They measure 5-1/2 inches wide. If you grade it for 5-1/2 inches you will be safe to not run over 10 yards (1 load). Use number 3 rebar (3/8 inch thick) and put them on 18 inch centers (24 inch centers if you are a cheap fuck). If you are tying into an existing concrete driveway, put a piece of black expansion joint material against the old concrete and drill into the concrete with some 3/8 inch tie bars.

Also, you will want to dummy joint the concrete on no more than 12' panels. That will probably mean one down the center and one going the other way. Use a 1/4 inch or 3/8 inch edger to round off the edges and broom it with some type of broom in the direction the water flows (downhill).


Hey Asshat - cLaY - 07-19-2005

asshat Wrote:New home builders around here generally put down a 2 inch sand cushion and then 4 inch concrete.

When I do city jobs, most cities require 5 inch concrete for driveways. If it was me, I would go with 6 inches since he is only ordering one load anyway.

Clay, use 2 x 6's for your forms. They measure 5-1/2 inches wide. If you grade it for 5-1/2 inches you will be safe to not run over 10 yards (1 load). Use number 3 rebar (3/8 inch thick) and put them on 18 inch centers (24 inch centers if you are a cheap fuck). If you are tying into an existing concrete driveway, put a piece of black expansion joint material against the old concrete and drill into the concrete with some 3/8 inch tie bars.

Also, you will want to dummy joint the concrete on no more than 12' panels. That will probably mean one down the center and one going the other way. Use a 1/4 inch or 3/8 inch edger to round off the edges and broom it with some type of broom in the direction the water flows (downhill).

$$$ thanks dawg.


this was an excellent troll job.


Hey Asshat - snarg - 07-19-2005

asshat Wrote:New home builders around here generally put down a 2 inch sand cushion and then 4 inch concrete.

When I do city jobs, most cities require 5 inch concrete for driveways. If it was me, I would go with 6 inches since he is only ordering one load anyway.

Clay, use 2 x 6's for your forms. They measure 5-1/2 inches wide. If you grade it for 5-1/2 inches you will be safe to not run over 10 yards (1 load). Use number 3 rebar (3/8 inch thick) and put them on 18 inch centers (24 inch centers if you are a cheap fuck). If you are tying into an existing concrete driveway, put a piece of black expansion joint material against the old concrete and drill into the concrete with some 3/8 inch tie bars.

Also, you will want to dummy joint the concrete on no more than 12' panels. That will probably mean one down the center and one going the other way. Use a 1/4 inch or 3/8 inch edger to round off the edges and broom it with some type of broom in the direction the water flows (downhill).


thank you, sir
i was just trying to save the phukker a little scratch, he seems to have finacial constraints

can he not use concrete mesh in place of the rebar??
if not, why not??
can he go high in the middle and maybe get by with about seven yds??
this could save him a few hunnert bucks