08-02-2006, 05:17 PM
Shenanigans Wrote:actually I need ten feet on the service wall plus 80 sf of floor space per each station. the piping will return to an ro room with water softener system, 2 carbon filters, reverse osmosis system, check valve and backflow preventer.
each station gets purified water from the ro room to perform the dialysis.
Thanks for the imput though.
Yeah, you need 80 sf of space per station...I thought we were just talking about the R/O system though.
I used to work in a kidney dialysis unit. One of the duties I had was to make sure the R/O systems were working properly.
BIRD33 Wrote:Im guessing BEW's vag loks like a hotdog that exploded in the microwave.

