InsaneTrain Forums
Asshat...Quick - Printable Version

+- InsaneTrain Forums (https://insanetrain.com)
+-- Forum: General (https://insanetrain.com/forumdisplay.php?fid=4)
+--- Forum: General Forum (https://insanetrain.com/forumdisplay.php?fid=8)
+--- Thread: Asshat...Quick (/showthread.php?tid=23088)

Pages: 1 2


Asshat...Quick - cLaY - 04-25-2005

what's the diameter of #5 rebar?


Asshat...Quick - Raiden - 04-25-2005

5/8"


Asshat...Quick - cLaY - 04-25-2005

Raiden Wrote:5/8"

you better be right


Asshat...Quick - Raiden - 04-25-2005

cLaY Wrote:you better be right
That's what the "#5" means. #3 is 3/8; #4 is 1/2...


Asshat...Quick - Gadonkadonk Money Dawg - 04-25-2005

He is.

Link Here


Asshat...Quick - Raiden - 04-25-2005

If you have any more swimming pool related questions, don't hesitate to ask.


Asshat...Quick - cLaY - 04-25-2005

Raiden Wrote:If you have any more swimming pool related questions, don't hesitate to ask.

Actually its for control structures and telescoping valve housings for wastewater lagoons i'm designing, but thanks.


Asshat...Quick - Bill - 04-25-2005

I thought rebar was sized in decimal inches?....ie #5 rebar = 1/2"


Asshat...Quick - asshat - 04-25-2005

5/8 inch. i wasn't online.


Asshat...Quick - Bill - 04-25-2005

Raiden Wrote:If you have any more swimming pool related questions, don't hesitate to ask.

Sweet!...how do I build my own inground?


Asshat...Quick - Raiden - 04-25-2005

asshat Wrote:5/8 inch. i wasn't online.
Sorry, Asshat...the man(?) needed his question answered so I jumped in on your thread. Confusedpliff:


Asshat...Quick - Raiden - 04-25-2005

Bill Wrote:Sweet!...how do I build my own inground?
It's really very easy.
First, go buy a ton of #3 rebar, which we now know is 3/8" in diameter.
Post up when you have that on site and I'll tell you what to do next.


Asshat...Quick - Bill - 04-25-2005

Raiden Wrote:It's really very easy.
First, go buy a ton of #3 rebar, which we now know is 3/8" in diameter.
Post up when you have that on site and I'll tell you what to do next.

1 ton?


Asshat...Quick - Raiden - 04-25-2005

Bill Wrote:1 ton?
Yes.


Asshat...Quick - Bill - 04-25-2005

Raiden Wrote:Yes.

Done....just so happens I got 2 tons behind the barn.


Asshat...Quick - asshat - 04-25-2005

Bill Wrote:Done....just so happens I got 2 tons behind the barn.
I watched them build mine. It looks pretty easy to me. The hardest part looked like the digging, but every single part of it can be sub contracted out. I seriously thought about getting some young bright kid to see if he would start a pool company and let me finance it. It looks easy enough for somebody that has the selling power to get out there and make it happen.


Asshat...Quick - Raiden - 04-25-2005

asshat Wrote:I watched them build mine. It looks pretty easy to me. The hardest part looked like the digging, but every single part of it can be sub contracted out. I seriously thought about getting some young bright kid to see if he would start a pool company and let me finance it. It looks easy enough for somebody that has the selling power to get out there and make it happen.
I take cash, checks, money orders, and paypal.


Asshat...Quick - Bill - 04-25-2005

I'll do the digging myself....perk to being a redneck. have tractor can dig....was actually thinking of one of these fiberglass pools.


Asshat...Quick - asshat - 04-25-2005

Bill Wrote:I'll do the digging myself....perk to being a redneck. have tractor can dig....was actually thinking of one of these fiberglass pools.

No, go with the gunnite. Much better.


Asshat...Quick - Bill - 04-25-2005

asshat Wrote:No, go with the gunnite. Much better.

gunnite?...

I just know I'll have to put in another pool...with my grade lines at the new homestead I might have to just build another multi level deck and put in another above grounder like I have now.